Vail Covered Bridge Restoration

Vail Covered BridgeThe Vail Covered Bridge is a historical landmark in the heart of this world-famous ski town.  The bridge underwent extensive restoration in 1994 to ensure its useful lifespan in the coming decades.  The bridge approaches and structure were analyzed and redesigned to accommodate larger loads and more pedestrian traffic.

The existing structure included concrete T-girders, which were x-rayed and analyzed for capacity before being replaced with new steel girders.  Each wood member of the bridge was inspected, along with every bolt, to determine the extend of restoration.  Temporary access during construction was designed using a prefabricated steel bridge that was eventually moved to a nearby golf course.  A lifting plan was created and the bridge was removed from it’s abutments and placed in the adjacent Eastern courtyard for ease of restoration activities and the replacement of the girders.  This work was performed while working at Loris and Associates in Boulder, Colorado.

Comments are closed.

Projects

Alternative and Highly Scalable Water and Wastewater Treatment

Alternative and Highly Scalable Water and Wastewater Treatment

We are huge consumers and wasters of water.  In its purest form, or as a contaminated waste product,[...]
ANA Chasma-e-Dosakh Kandak WWTP

ANA Chasma-e-Dosakh Kandak WWTP

In the Spring of 2012 Odisea delivered the design of the waste water treatment plant for the future [...]
ANP National Police Training Center (NPTC)

ANP National Police Training Center (NPTC)

The Afghanistan National Police NPTC was  completed by Technologists Inc (Ti) in 2012 and is a proje[...]
Straw House Market

Straw House Market

Another very unique project was the engineering and construction activities on the Straw House Marke[...]
Straw Bale Horse Arena and Caretaker's Residence

Straw Bale Horse Arena and Caretaker's Residence

During the year of 2006 Odisea acted as the general contractor on the largest bale structure at the [...]
Little Dry Creek Pedestrian Trail

Little Dry Creek Pedestrian Trail

The City of Westminster commissioned the design and construction of a portion of the Little Dry Cree[...]
Golden Run Annexation

Golden Run Annexation

Odisea is part of a team of hand-picked consultants on the annexation of the largest remaining undev[...]
Constructed Wetland WWTP

Constructed Wetland WWTP

  Odisea was hired to design a wastewater treatment plant (WWTP) for Kittitian Hills resort [...]