Puelbo County 25th Lane and South Road Intersection Design

This project consisted of a crossing over the Bessemer Ditch and adjacent design of the intersection of 25th Lane and South Road in Pueblo County, Colorado.  The effects on Lombard Avenue were also considered as the proposed vertical profile affected the intersection with 25th Lane.

Comments are closed.

Projects

Golden Run Annexation

Golden Run Annexation

Odisea is part of a team of hand-picked consultants on the annexation of the largest remaining undev[...]
Straw Bale Horse Arena and Caretaker's Residence

Straw Bale Horse Arena and Caretaker's Residence

During the year of 2006 Odisea acted as the general contractor on the largest bale structure at the [...]
Autonomous Tent

Autonomous Tent

The Autonomous Tent concept was sprouted by Phil Parr, an IT person with no prior experience in the [...]
ANA National Maintenance Facility (NMF)

ANA National Maintenance Facility (NMF)

The Afghanistan National Army, National Maintenance Facility is a multifunctional maintenance compou[...]
High Mountain Chalet (Hell Canyon Road)

High Mountain Chalet (Hell Canyon Road)

During the summer of 2000 and into the spring of 2001 Odisea acted as one of two General Contractors[...]
Silver Leaf Cohousing

Silver Leaf Cohousing

The Silver Leaf Cohousing project in our hometown of Paonia, Colorado is beginning the first stages [...]
Constructed Wetland WWTP

Constructed Wetland WWTP

  Odisea was hired to design a wastewater treatment plant (WWTP) for Kittitian Hills resort [...]
Electrocoagulation Water and Waste Water Treatment

Electrocoagulation Water and Waste Water Treatment

During the first half of September of 2012 Odisea participated in a pilot demonstration to treat wat[...]