Puelbo County 25th Lane and South Road Intersection Design

This project consisted of a crossing over the Bessemer Ditch and adjacent design of the intersection of 25th Lane and South Road in Pueblo County, Colorado.  The effects on Lombard Avenue were also considered as the proposed vertical profile affected the intersection with 25th Lane.

Comments are closed.

Projects

ANA National Maintenance Facility (NMF)

ANA National Maintenance Facility (NMF)

The Afghanistan National Army, National Maintenance Facility is a multifunctional maintenance compou[...]
Wadesboro Solar

Wadesboro Solar

In 2017 the 7.65 megawatt (DC) Wadesboro Solar project was installed in North Carolina near the Town[...]
Constructed Wetland WWTP

Constructed Wetland WWTP

  Odisea was hired to design a wastewater treatment plant (WWTP) for Kittitian Hills resort [...]
Pine Valley Ranch Pedestrian Bridges

Pine Valley Ranch Pedestrian Bridges

Pine Valley Ranch Open Space is operated by Jefferson County, Colorado near the small town of Pine a[...]
High Mountain Chalet (Hell Canyon Road)

High Mountain Chalet (Hell Canyon Road)

During the summer of 2000 and into the spring of 2001 Odisea acted as one of two General Contractors[...]
ANP National Police Training Center (NPTC)

ANP National Police Training Center (NPTC)

The Afghanistan National Police NPTC was  completed by Technologists Inc (Ti) in 2012 and is a proje[...]
Jalalabad Airfield (JAF) Wastewater Treatment Plant

Jalalabad Airfield (JAF) Wastewater Treatment Plant

Jalalabad Airfield (JAF, also known as FOB Fenty) houses over 5,000 personnel ranging from airfield [...]
Straw Bale Horse Arena and Caretaker's Residence

Straw Bale Horse Arena and Caretaker's Residence

During the year of 2006 Odisea acted as the general contractor on the largest bale structure at the [...]