Golden Run Annexation

Zoning Map

Odisea is part of a team of hand-picked consultants on the annexation of the largest remaining undeveloped parcel of land in East Boulder County, Colorado.  Golden Run is a 360-acre parcel that is within the planning area of the Town of Erie.

Odisea is the lead planner during the annexation phase, including conceptual design, utility demand projections and reports, traffic surveys, zoning impact studies and environmental impact analyses.  All annexation submittals are made by Odisea to the Town of Erie and managed as the process moves forward.

Aaron Harber, the owner of Golden Run, holds a very progressive vision for the project.  He foresees an example of development that will be a model of sustainable living.  His vision includes on-site power generation using solar and wind, and wastewater treatment using greenhouse technology and other low-impact treatment regimes.  Stormwater will be responsibly managed and re-used by directing it through treatment and storage areas.  The project will mimic traditional neighborhoods with a grid street layout and alleys for services such as garbage collection and utility easements.  Technology will be highlighted through the integration of state-of-the-art communications, monitoring and control of the on-site utilities.

Golden Run will emphasize senior living and attract families of all ages through affordable housing initiatives.  For a complete description of this unique and exciting project, we encourage you to visit their website.

Leave a Reply

Projects

Silver Leaf Cohousing

Silver Leaf Cohousing

The Silver Leaf Cohousing project in our hometown of Paonia, Colorado is beginning the first stages [...]
Autonomous Tent

Autonomous Tent

The Autonomous Tent concept was sprouted by Phil Parr, an IT person with no prior experience in the [...]
High Mountain Chalet (Hell Canyon Road)

High Mountain Chalet (Hell Canyon Road)

During the summer of 2000 and into the spring of 2001 Odisea acted as one of two General Contractors[...]
Electrocoagulation Water and Waste Water Treatment

Electrocoagulation Water and Waste Water Treatment

During the first half of September of 2012 Odisea participated in a pilot demonstration to treat wat[...]
Jalalabad Airfield (JAF) Wastewater Treatment Plant

Jalalabad Airfield (JAF) Wastewater Treatment Plant

Jalalabad Airfield (JAF, also known as FOB Fenty) houses over 5,000 personnel ranging from airfield [...]
Little Dry Creek Pedestrian Trail

Little Dry Creek Pedestrian Trail

The City of Westminster commissioned the design and construction of a portion of the Little Dry Cree[...]
ANP National Police Training Center (NPTC)

ANP National Police Training Center (NPTC)

The Afghanistan National Police NPTC was  completed by Technologists Inc (Ti) in 2012 and is a proje[...]
Alternative and Highly Scalable Water and Wastewater Treatment

Alternative and Highly Scalable Water and Wastewater Treatment

We are huge consumers and wasters of water.  In its purest form, or as a contaminated waste product,[...]