Creekside Townhomes

Creekside Townhomes is a multi-family residential development along Rifle Creek in downtown Rifle, CO. Odisea acted as the civil and structural engineer on the entire development (infrastructure and buildings).

With much of the property in or adjacent to the floodplain, the development required retaining walls along the creek, drainage treatment prior to flowing into the […]

Road 29 Pedestrian Underpass

In 2017 Odisea designed a pedestrian underpass for Mesa County, Colorado outside of Grand Junction. The underpass links the sidewalks on both sides of the 29 Road bridge over the Colorado River and provides future links as trails are added to the Mesa County open space inventory.

West Side 29 Road Underpass

29 Road […]

Silver Leaf Cohousing

The architects rendering of a typical residential unit.

The Silver Leaf Cohousing project in our hometown of Paonia, Colorado is beginning the first stages of infrastructure installation as of late 2016. The project is geared toward community elders who wish to share amenities and ultimately have a small footprint on the Town and planet.

[…]

Vail Covered Bridge Restoration

The Vail Covered Bridge is a historical landmark in the heart of this world-famous ski town. The bridge underwent extensive restoration in 1994 to ensure its useful lifespan in the coming decades. The bridge approaches and structure were analyzed and redesigned to accommodate larger loads and more pedestrian traffic.

The existing structure included concrete T-girders, […]

Pine Valley Ranch Pedestrian Bridges

Pine Valley Ranch Open Space is operated by Jefferson County, Colorado near the small town of Pine along the North Fork of the South Platte River. We executed the civil and structural design associated with five prefabricated steel pedestrian brides that extended the usefulness of the existing trail network within the park. Hydrological studies were […]

Puelbo County 25th Lane and South Road Intersection Design

This project consisted of a crossing over the Bessemer Ditch and adjacent design of the intersection of 25th Lane and South Road in Pueblo County, Colorado. The effects on Lombard Avenue were also considered as the proposed vertical profile affected the intersection with 25th Lane.

Little Dry Creek Pedestrian Trail

The City of Westminster commissioned the design and construction of a portion of the Little Dry Creek trail in 1995 between Lowell Blvd and West 76th Avenue. We performed the entire civil design, pedestrian underpass design with associated walls and drainage, grading and hydrologic modeling, and takings delineation. These services were performed while working at […]