Golden Run Annexation

Zoning Map

Odisea is part of a team of hand-picked consultants on the annexation of the largest remaining undeveloped parcel of land in East Boulder County, Colorado. Golden Run is a 360-acre parcel that is within the planning area of the Town of Erie.

Odisea is the lead planner during the annexation phase, including […]

Projects

Jalalabad Airfield (JAF) Wastewater Treatment Plant

Jalalabad Airfield (JAF) Wastewater Treatment Plant

Jalalabad Airfield (JAF, also known as FOB Fenty) houses over 5,000 personnel ranging from airfield [...]
ANA National Maintenance Facility (NMF)

ANA National Maintenance Facility (NMF)

The Afghanistan National Army, National Maintenance Facility is a multifunctional maintenance compou[...]
Autonomous Tent

Autonomous Tent

The Autonomous Tent concept was sprouted by Phil Parr, an IT person with no prior experience in the [...]
Golden Run Annexation

Golden Run Annexation

Odisea is part of a team of hand-picked consultants on the annexation of the largest remaining undev[...]
Alternative and Highly Scalable Water and Wastewater Treatment

Alternative and Highly Scalable Water and Wastewater Treatment

We are huge consumers and wasters of water.  In its purest form, or as a contaminated waste product,[...]
ANA Chasma-e-Dosakh Kandak WWTP

ANA Chasma-e-Dosakh Kandak WWTP

In the Spring of 2012 Odisea delivered the design of the waste water treatment plant for the future [...]
Electrocoagulation Water and Waste Water Treatment

Electrocoagulation Water and Waste Water Treatment

During the first half of September of 2012 Odisea participated in a pilot demonstration to treat wat[...]
ANP National Police Training Center (NPTC)

ANP National Police Training Center (NPTC)

The Afghanistan National Police NPTC was  completed by Technologists Inc (Ti) in 2012 and is a proje[...]